What can be built today, and what it depends on

Two invention disclosures from the workshop of this volume, given here in the version for sites worldwide. Empirically supported are the individual components, all of which exist and have been tested. Theoretically extrapolated are their combination and all costs; every figure is an estimate with an uncertainty of about thirty percent, as of 2026. None of it has been built. Both studies have been published as open invention disclosures (DOI [insert]) so that no one can patent the combination and anyone may build it.

Preliminary remark

Pace, Sink, Reserve states that none of the great problems is physically unsolved and that the bottleneck lies in self-binding. A sentence of that kind needs evidence that does not rely on others. The two studies that follow are our own attempt to test it in a single field, the removal of carbon dioxide from the air. They are designed so that every assembly could be ordered today. What emerges is a displacement of the problem: the chemistry is known, the energy is available, and the question on which the first study fails and around which the second is built is who can independently verify a removed tonne. That is an institutional question in technical form.

I. The technical photosynthesis forest

A tree of this forest is a twelve-metre steel structure with twelve leaves. Each leaf is a bifacial solar module whose underside carries a lamella pack of moisture-swing resin. This resin takes up carbon dioxide while it is dry and releases it as soon as it becomes moist. The trunk is a tube that works as a solar chimney: the air warmed by the modules rises inside it and draws fresh air across the lamellae, without fans, at three to four thousand cubic metres an hour in still air. At sunset a hood of infrared-transparent film closes over the crown. Leaves and lamellae radiate their heat into the clear night sky, cool below the dew point, and dew condenses on the resin. The bound gas is released, the concentration in the sealed crown space rises to five to ten percent, and a small compressor at the foot of the trunk pushes it into a bed of crushed steel slag and basalt beneath the tree, where over hours it becomes carbonate. In the morning the hood retracts, the dew cleans the modules, and the cycle begins again.

Every component exists on its own. Moisture-swing sorbents made from ion-exchange resins have been developed at Arizona State University since 2011 and are loaded passively in Carbon Collect's MechanicalTree. The solar chimney at Manzanares in Spain ran from 1982 to 1989. Dew harvesting by night-time radiative cooling was demonstrated at ETH Zurich in 2021, at up to half a litre per square metre and day. Carbonation of slag and basalt with moist carbon dioxide at ambient pressure is practised by Orbix, Carbfix and Arca. What is new is the coupling: the waste heat of the modules drives the air, their radiative cooling supplies the regeneration water, their electricity drives the compressor, and the foundation is the store. Every part works for two purposes.

The tree needs dry days, humid, clear nights and a steady wind across the crown. That is the climate of the coastal deserts: the Namib, the Atacama, Baja California, Oman's Dhofar coast, Cabo Verde, the Canary Islands, and in summer south-eastern Spain. These places also combine the best solar resource, cheap land and ports for slag and basalt. A tree with eight kilowatts of peak output delivers about thirteen megawatt-hours of electricity a year, exports ninety-five percent of it, and binds just under two tonnes of carbon dioxide in the first series, five in a mature series. The higher figure assumes that wind roughly doubles the airflow of the chimney; without wind the limit is about four tonnes. A forest of a thousand hectares with sixty thousand trees replaces a solar park of nearly five hundred megawatts and, by design, removes a hundred and fifty thousand tonnes a year without transporting any of it. It needs, per tonne, a tenth of the energy that direct air capture consumes today.

The costs depend on a single quantity, the sorbent. At today's resin price and lifetime, the first series comes to about 1,800 euros per tonne, above the pilot plants for direct air capture but with the opposite energy balance. With mass-produced membranes and a ten-year lifetime the figure falls to about 230 euros, and in the target state to about 110. Everything else is plant engineering.

The weak point is not the chemistry. It is the foundation. What the gravel bed binds can be balanced by gas analysis at the bed outlet, but no one can weigh it independently, and mineralisation in a gravel bed is, to this day, a recognised method in no certification registry. A tonne without a certificate is a tonne without a buyer and without a bank. The second study is the rebuilding of the first around exactly this proof.

II. The lime cascade

The cascade replaces the gravel bed with a pair of steel troughs holding together eighteen tonnes of hydrated lime, through which the enriched gas from the crown flows. Hydrated lime binds carbon dioxide at five to ten percent within hours, at ambient temperature, and a tonne of it takes up as much as 0.59 tonnes of gas. In a packed bed, however, a carbonate crust forms around the grains and stops the reaction before the lime is fully converted; the design assumes seventy percent. After about a year and a half the cassette is saturated. A loader exchanges it, and the proof is a procedure that any haulier understands: the cassette is weighed on the same calibrated scale when it is charged and when it is removed, and the difference is the quantity bound, accurate to twenty kilograms on twenty-four tonnes.

The full cassette travels to a partner works within truck range, where an electrically heated fluidised-bed reactor breaks the carbonate open again at 900 degrees. The gas is more than ninety-five percent pure, is compressed and goes to geological storage or to the chemical industry; the gas balance at the reactor is the second, independent measurement of the same tonnage. The burnt lime is slaked and returns in the same cassettes on the same truck. At the end of its service life it goes as feedstock to the cement industry, which needs it anyway.

Four decisions make this a system. First, the cascade of concentration: the resin lifts 420 ppm to five to ten percent, the lime bed lifts the gas to a solid, the reactor lifts the solid to a pure gas, and no stage would be economic on its own. Second, one reactor with three feeds: the same calciner burns carbonate from the cassettes of the forest and from the capture unit at a biogenic heat and power plant, and at 500 degrees it dehydrates hydrated lime for a thermochemical electricity store. A forest alone would occupy it for eleven hundred hours a year; in combination it exceeds five thousand. The forest does not buy its most expensive component; it rents it. Third, closing the water loop: the reaction releases 0.41 tonnes of water per tonne of carbon dioxide, which keeps the cassette moist and whose surplus is sprayed onto the resin on dewless nights. In a coastal desert this is the first sentence of every permit application: the plant withdraws no groundwater, it produces water. Fourth, one material with three lives and separate inventories: fresh lime goes to the store, where purity matters, after a few hundred cycles to the cassettes, where it does not, and only at the last to the cement works. Hydration and carbonation compete for the same calcium, so the two loops run separately and touch at a single point.

The reference site is therefore no longer the desert with the best climate but the arid region with a lime or cement works within a hundred kilometres. In Europe that is the province of Almería, with a cement works on the coast and the Plataforma Solar as a research neighbour. Outside Europe the Atacama around Antofagasta, the Dhofar coast around Salalah and Baja California meet the same condition, and any coastal region that combines a cement industry with a fog climate is a candidate. A plant of two hundred hectares with twelve thousand trees exports about 175 gigawatt-hours of electricity and, in the mature series, removes sixty thousand tonnes a year. Eight to nine truck trips a day suffice.

Net costs come to about 400 euros per tonne, about 250 in the target state, and about 215 at a thousand hectares. That is dearer than capture at biogenic point sources with the same calciner, which is possible for under 100 euros, but without their limit on quantity, and it lies well below direct air capture at 500 to 900 euros. The cascade occupies the gap between the cheap, finite method and the expensive, unlimited one, and it does so with plant components that are built for the cheap method anyway. Compared with the forest alone, the cost per tonne rises from a computed 230 to about 400 euros. That is the price of the proof: the 230 euros applied to a gravel bed whose bound quantity no one can attest. The 400 euros apply to a tonne with two independent measurement paths, to pure gas that can be certified under an already recognised method, and to a lime cycle that does not consume itself.

III. Risks and sequence

The governing risk of both studies is the same: price, capacity and lifetime of the moisture-swing resin decide between 1,800 and 100 euros per tonne. The cascade adds a dependency the forest alone did not have: the calciner belongs to a third party, and without a long-term contract with a capacity guarantee over the depreciation period of the forest, the cassettes stand idle. Hydrated lime is caustic, which is why the cassettes arrive on site sealed. And the coastal deserts lie mostly in countries whose land law, grid access and political stability are project risks.

The order of testing follows the cost of knowledge. A cassette trial with two hundred kilograms of hydrated lime and gas at five to ten percent takes months, costs little and decides the degree of conversion, crust formation and water balance. Developing the resin takes years, costs a great deal and decides everything else. A single full-size tree with one cassette pair, calibrated weighing and an independent gas balance provides the template for an accounting protocol with a registry. Then a grove of sixty trees, then the acreage.

What stands out in this sequence is where the long deadlines lie. The chemistry is tested in months. An offtake contract over ten years, a capacity contract over the lifetime of a plant and the admission of a method to a registry take years and bind parties who will by then have left office. That is exactly the quantity that Pace, Sink, Reserve calls self-binding, and it is the only one in these two studies that cannot be ordered.

Discussion of the chapter